Or is the following starting to sound like a good idea:

With the University having to come up with $22 million dollars for the Stroh Center, why not delay construction for a year. This will give time to do some minor redesigns to make it a dual purpose facility. Attach it to the back of the Ice Arena so the team can continue to use one locker room. The University ponies up $4 million dollars to do the necessary improvements to the current Ice Arena as well as some cosmetic upgrades outside. Then start a major fundraiser for the rest of the money needed. The university shows a MAJOR commitment to the hockey program, the donors open up their check books. and the students don't get an increase in student fees. Does this make way too much sense?
Phi or Die
User avatar
It's the Journey...
Peregrine
Peregrine
Posts: 2347
Joined: Sat Jul 24, 2004 10:17 pm
Location: Bowling Green, Ohio

Post by It's the Journey... »

No! It makes no sense at all. The fesability (sp?) was done and a multipurpose factility would cost in the 90 million range. We can not come up with that. Plus a dual facility is an absolute cluster *#$% and will eliminate almost all of the time the facility could be used for non University events during the season The Univrersity needs to have TWO facilities it can make a lot of money with, not ONE facility that is tied up and cannot be used to make money 60% of the time. I know people at Ohio State who believe making the Schotenstein (sp?) Center a dual facility was just about the WORST decision the athletic department there has ever made. If you want the University to make a MAJOR commitment to hockey it needs to be a facility with hockey as its specific purpose for existing. :evil:
"If all do not join now to save the good old ship of the Union this voyage nobody will have a chance to pilot her on another voyage."
A. Lincoln


The BGSU Men's Chorus
America's Finest Singing Machine
BGSU Brothers Sing On

Charge on Colts, Charge on!

"ROLL ALONG!"
bgpuckster
Egg
Egg
Posts: 143
Joined: Sun Dec 07, 2008 6:35 am

Post by bgpuckster »

I have a hard time believing a feasibility study found a dual purpose facility would cost $90 million. Stroh is at $36 million and Miami built a fancy top end rink with 2 sheets of ice for around $30 million. Those two combined built entirely separate would total $66 million. How does a dual use facility (one building to build, not two) end up almost the cost the price of 3 separate buildings? I think someone is blowing smoke somewhere. I'm not saying to combine them or not, I'm just questioning the dollar amount as I've heard that same $90 million number.
User avatar
murphdogg
Fledgling
Fledgling
Posts: 421
Joined: Sun Jan 25, 2009 1:56 am
Location: BGSU

Post by murphdogg »

There's also the issue of switching floors. If they wanted to continue to do those hockey/basketball doubleheaders that I love so much, either the hockey team would have to play some of its games in the Ice Arena or the basketball team would have to play in Anderson part of the season because switching floors takes several hours and lots of equipment (one of the reasons for $90 million). It would be an absolute scheduling nightmare, one that I am sure BGSU doesn't want to deal with.
Guns don't kill people, Kai Kantola kills people

2008-2009 Men's and Women's Basketball MAC Champions
User avatar
Chimie
Chick
Chick
Posts: 168
Joined: Thu Sep 06, 2007 11:06 am
Location: Bowling Green, OH

Post by Chimie »

Remember the series with OSU in the playoffs? It was held at their old arena due to an event at the Shot. Ultimately, the dual-use facility would cost more due to the extra cost of size, floor switching, equipment. It just wasn't feasible.
6500 miles couldn't stop me from cheering on my Falcons!
User avatar
Freddie
Peregrine
Peregrine
Posts: 1052
Joined: Fri Oct 29, 2004 12:14 am
Location: Federal League

Post by Freddie »

I'm sure that 96mil number is way off, but the schedule problems and set up/conversion is a REAL problem. The process of changeover takes 3-4 hours even with a large crew. Who would do that here?

http://www.youtube.com/watch?v=iwq1tFc3 ... re=related
Du hockey comme dans le temps!
MACMAN

Post by MACMAN »

I like the idea of attaching the Stroh to the rink, sharing the hall of fame etc.. real neat.
I also like the idea of taking some much needed pause on the shelling out 20+ mil to pay for it, when the University has exisiting buildings that need to be taken care of first. New needs to be put on hold until old is upgraded and properly maintained!